6,322 hours
Projects
Shutdown Project, 2019
Proveo was brought on site for the first time to this location to facilitate Remote Confined Space Monitoring (RCSM).
Challenge: Being the first time that RCSM has been used on this site, challenges arose regarding product familiarity between the end-user and the system.
Action: Through proactive planning and direct engagement with the work-face, these challenges were quickly overcome.
Result:
- Overall cost savings vs traditional confined space management: 37.50%
- Reduced risk exposure hours for personnel: 6,322 hours
Takeaway: Our confined space management systems can be integrated into any job site and our team is ready and able to assist in the set up.
Risk exposure hours reduced
Total cost reduction
37.5 %
Project details
Project:
Northern Alberta Shutdown Project Review - 2019
Category:
Remote Confined Space Monitoring (RCSM)